Imported from previous forum
This is a basic question.
Scenario 1:
- Client sends NOS message with TIF = GTC
- Client sends an replace with quantity change on this message without tag TIF
What should this be considered ?
a) Replace from GTC to Day order with qty change ?
b) Replace for qty change but TIF as GTC
Scenario 2:
- Client sends NOS message with TIF = GTC
- Client sends an replace with no other change than NOS but without TIF on the message
What should this be considered ?
a) Replace from GTC to day order?
b) No change , consider the order as GTC
First of all, it does not matter whether only TIF is different from NOS or TIF and other fields such as qty.
Volume 4 of the spec is quite clear on this, i.e. “All of the application-level fields in the original order should be retransmitted with the original values in the Order Cancel/Replace Request, except the fields that are being changed.”
Leaving out TIF hence means that you are sending the default which is 0=“Day”.
This is a basic question.
Scenario 1:
- Client sends NOS message with TIF = GTC
- Client sends an replace with quantity change on this message without tag TIF
What should this be considered ?
a) Replace from GTC to Day order with qty change ?
b) Replace for qty change but TIF as GTCScenario 2:
- Client sends NOS message with TIF = GTC
- Client sends an replace with no other change than NOS but without TIF on the message
What should this be considered ?
a) Replace from GTC to day order?
b) No change , consider the order as GTC